Changes to Soil Relocation in BC Are Here.

Changes to Soil Relocation in British Columbia, March 2023 Final Policy Update


Watch the final webinar summary to learn what has changed from the last webinar and how it could affect your business.


Watch the Summary Here


The Stage 14 Amendments of the Contaminated Site Regulation took effect on March 1st.  This includes the newly released Protocol 19 which lays out the requirements for how assessments of uncontaminated soil will be conducted within the context of the new Soil Relocation provisions included with the Stage 14 Amendments.

These new regulations will make moving soil from a wide variety of sites more difficult and costly, potentially disrupting excavation schedules and logistics.

We invited Travis Deeter, P.Ag., CSAP, Associate and Senior Environmental Scientist with Thurber Engineering, to share his insights on the topic.

Points covered include:

  • Final Soil Relocation Process
  • Protocol 19 - Assessment
  • High Volume Receiving Sites
  • Anticipated Challenges
  • What are Schedule 2 activities.
  • Q & A Session 

Visit the ministry website to download a copy of the PDF file.


    Let’s work together to create better solutions.

    VIEW UPCOMING EVENTS AT:

    https://fillconnect.eventbrite.com

    CONNECT

    For more questions about this webinar, please contact:

    Travis Deeter, P.Ag., CSAP
    Environmental Scientist Associate
    Thurber Engineering Ltd.
    tdeeter@thurber.ca
    www.thurber.ca

    Mana Arabi, P.Eng
    CEO & Co-founder
    Fill Connect Inc.
    mana@fillconnect.com
    www.fillconnect.com




    Comments